      Your position:Home - News - Industry News
      Issues on Code for Design and Construction of Steel Structures
      Release time:2020/3/18 14:54:43      The number of clicks:1098

      Some problems and solutions during the construction of steel structures

      1. Production and production of components

      The gantry steel frame is thin and can be as thin as 4 mm. Cutting of multiple sheets should be selected to avoid cutting with flame. Because cutting with flame will cause a large wave deformation of the board edge. At present, most manufacturers of H-beam welding use submerged arc welding or semi-automatic welding. If the control is not good, welding deformation should occur, and the component will be bent or twisted.

      2, column foot installation problem

      (1) Problems with embedded parts (anchor bolts): overall or layout deviation; incorrect elevation; no protective measures have been taken for wire fasteners. The bolt holes of the bottom plate of the steel column are directly misaligned, resulting in insufficient length of the thread fastener.

      Measures: The steel structure construction unit cooperates with the civil construction unit to complete the work of embedded parts, before the concrete is poured. Relevant dimensions must be reviewed and firmly secured.

      (2) Anchor bolts are not vertical: The horizontality of the foot of the frame column is poor, the anchor bolts are not vertical, and the horizontal error of the embedded anchor bolts after the foundation is large. The pillars are not in a straight line after installation, and they are crooked from east to west, which makes the appearance of the house difficult to see, which brings errors to the installation of the steel columns, the structure is affected by force, and does not meet the requirements of the construction acceptance code.

      Measures: Anchor bolts should be installed by first leveling the bottom plate with the lower adjusting bolts and then filling them with non-shrinking mortar for secondary grouting. This method is used abroad. Therefore, anchor bolts can be used for fixing anchor bolts such as steel bars or angle steel. Welded into a cage, perfect support, or take some other measures to avoid moving the anchor bolt one bit when pouring the foundation concrete.

      (3) Anchor bolt connection problem phenomenon: The column anchor bolt is not tightened, and the backing plate is not welded to the bottom plate; part of the anchor bolt is not exposed with 2 to 3 wire buckles.

      Measures: Welding anchor rods and nuts should be adopted; outside the chemical anchor bolts, thicker fire-resistant coatings and heat insulation treatments should be used to prevent the anchoring performance from being affected in the event of a fire; additional observation data for foundation settlement should be added.

      3. Connection problems

      (1) High-strength bolt connection

      1) The bolt equipment surface does not meet the requirements, which makes the bolts difficult to install, or the degree of bolt tightening does not meet the design requirements.

      Cause Analysis:

      ① There are impurities such as floating rust and oil stain on the surface, and there are burrs and welding knobs on the bolt holes.

      ② Although the bolt mounting surface is still lacking after treatment.

      Solution:

      ① The surface of high-strength bolts should be cleaned one by one if they have rust, oil stains, and bolt holes. Before use, it must be rust-proofed, so that the bolts used for assembly must not be used in the formal assembly. Bolts should be kept and distributed by a special person.

      ② When handling the assembly surface, consideration should be given to the order of construction and installation to prevent repetition, and try to handle it before lifting.

      2) The bolt screw is damaged, and the screw cannot be screwed into the nut, which affects the assembly of the bolt.

      Cause analysis: The wire buckle was severely rusted.

      Solution:

      ① Bolts should be selected before use, and pre-configured after cleaning and rust removal.

      ② Bolts damaged by wire buckles cannot be used as temporary bolts, and it is strictly forbidden to force them into the screw holes.

      ③ The pre-selected bolt assemblies should be stored according to sleeves, and they should not be interchanged when in use.

      (2) On-site welding seam phenomenon: It is difficult to guarantee the quality; the first and second grade welding seams which are designed to be fully welded are not used for inspection; the main beams and columns of the floor are not welded; arc welding plates are not used for welding.

      Solution: Before welding the steel structure, check the qualification certificate of the electrode, select the welding rod according to the design requirements, use the electrode according to the instructions and operating procedures, and there should be no cracks or nodules on the surface of the weld. There must be no pores, slag inclusions, arc pit cracks, welds must not have undercuts, underfilled welds, etc., non-destructive testing of primary and secondary welds according to requirements, the welder's stamp should be checked at the specified welds and parts. Unqualified welds shall not be processed without authorization. After the modification process is determined, the welds shall not be repaired more than twice.

      4.Deformation of components

      (1) When the component is deformed during transportation, dead bends or slow bends occur, making the component unable to be installed.

      Cause Analysis:

      1) Deformation due to welding during the production of components generally shows a gentle bend.

      2) When the component is ready for transportation, the support points are unreasonable. For example, if the upper and lower dunnages are not vertical, or the storage site is subsided, the component will be dead bent or slowly deformed.

      3) Deformation due to collision during transportation of components, generally showing dead bends.

      Precaution:

      1) When manufacturing components, measures to reduce welding deformation are adopted.

      2) During assembly and welding, measures such as deformation in the opposite direction are adopted. The assembly sequence should obey the welding sequence. Use assembly tires and set enough brackets to prevent deformation.

      3) During transportation and transportation, pay attention to the reasonable allocation of pads.

      Solution:

      1) Dead bending of members, mechanical correction is generally adopted. Correction with jack or other tools or supplementation with oxyacetylene flame

      2) When the structure is deformed slowly, oxyacetylene flame heating is adopted to correct it.

      (2) The total length of the steel beam members after assembly is distorted beyond the allowable value, resulting in poor installation quality of the steel beam.

      Cause Analysis:

      1) The splicing process is unreasonable.

      2) The dimensions of the assembled nodes do not meet the design requirements.

      Solution:

      1) Assembling components should be equipped with assembly tables. When welding is set, the bottom surface of the components should be leveled to prevent warping. The fulcrum of the assembly table should be level, and welding deformation should be prevented during group welding. Especially for the assembly of beam sections or stairways, it is necessary to adjust the deformation after tack welding, and pay attention to the size of the joints in accordance with the design, otherwise it is easy to cause component distortion.

      2) Components with poor rigidity should be reinforced before turning over and welding, and leveling should also be performed after turning over, otherwise the components cannot be corrected after welding.

      (3) The element is arched, and the value is large or smaller than the design value. When the arch value of the component is small, the beam is deflected after installation; when the arch value is large, the extrusion surface elevation is likely to exceed the standard.

      Cause Analysis:

      1) The dimensions of the components do not meet the design requirements.

      2) During the erection process, the measured and calculated values are not used.


      You are interested in the news
      Previous:How long can steel structure works
      Next:Grid-framed buildings are a good form of construction

      Back to list

      主站蜘蛛池模板: 福利电影一区二区三区| 激情久久精品| 国产一区二区电影| 国内精品99| 欧美日韩一区二区三区精品| 国产乱淫精品一区二区三区毛片| 亚洲国产精品日本| 亚洲欧洲另类精品久久综合| 欧美一区二区三区免费播放视频了| 高清国产一区二区| 在线精品视频一区| 99精品少妇| 国产精品久久久久久久久久久久冷| 午夜看片在线| 538国产精品一区二区在线| 中文字幕在线播放一区| 色婷婷综合久久久中文一区二区| 久久国产激情视频| 99久久免费精品国产男女性高好| 日韩三区三区一区区欧69国产| 日本美女视频一区二区| 精品福利一区二区| 精品久久综合1区2区3区激情| 韩国视频一区二区| 亚洲乱码av一区二区三区中文在线:| 日韩午夜三级| 国产精品96久久久久久久| 久久精品国产亚洲7777| 中文字幕欧美另类精品亚洲| 日韩亚洲国产精品| 电影午夜精品一区二区三区| 国产第一区在线观看| 中文字幕一区2区3区| 97视频一区| 午夜激情看片| 国产精品视频十区| 国产欧美日韩一区二区三区四区| 免费高潮又黄又色又爽视频| 亚洲精品国产精品国自| av午夜影院| 国产精品久久久久久久四虎电影| 欧美日韩精品在线播放| 精品免费久久久久久久苍| 日韩精品少妇一区二区在线看| 狠狠色噜噜狠狠狠四色米奇| 国产精品日产欧美久久久久| 久久99亚洲精品久久99果| 国产日韩精品一区二区| 欧美午夜精品一区二区三区| 欧美激情片一区二区| 17c国产精品一区二区| 日本中文字幕一区| 亚州精品中文| 日韩区欧美久久久无人区| 国产精品视频一二区| 国产一区二区极品| 欧美xxxxhdvideos| 狠狠色依依成人婷婷九月| 中文字幕制服丝袜一区二区三区| 国产欧美一区二区精品久久| 国产一区二区三区四| 亚洲精品国产一区二区三区| 玖玖爱国产精品| 99久久免费毛片基地| 国产va亚洲va在线va| 欧美性xxxxx极品少妇| 精品国产一区二| 亚洲精品一区中文字幕| 国产欧美性| 国产一区二区播放| 国产乱子一区二区| 浪潮av色| 中文字幕一区三区| 中文字幕一区二区三区又粗| 免费看性生活片| 欧美精品在线不卡| 欧美日韩乱码| 亚洲国产精品一区在线观看| 小萝莉av| 91久久一区二区| 欧美精品一卡二卡| 日韩美一区二区三区| 一区二区三区国产精华| 国产大学生呻吟对白精彩在线| 国产欧美日韩va另类在线播放| 在线国产精品一区二区| 国产91清纯白嫩初高中在线观看| 欧美日韩亚洲三区| 日本xxxx护士高潮hd| 浪潮av网站| 一区二区久久精品66国产精品| 国产精品一级片在线观看| 日本三级香港三级| 国产一级片大全| 一区二区不卡在线| 国产呻吟久久久久久久92 | 国内自拍偷拍一区| 国内久久久| 欧美日韩一区二区三区69堂| 色噜噜狠狠色综合影视| 国产区二区| 国产精品欧美一区二区三区| 欧美一区二区三区艳史| 亚洲国产欧美国产综合一区| 精品少妇一区二区三区免费观看焕 | 欧美日韩国产综合另类| 国产伦精品一区二区三区免费下载| 国产欧美一区二区三区免费看 | 午夜wwww| 国产一区二区资源| 欧美一区二区在线不卡 | 久久99精品久久久噜噜最新章节| 午夜影院试看五分钟| 国产伦精品一区二区三区照片91| 精品videossexfreeohdbbw| 国产91精品一区二区麻豆亚洲| 欧美日韩中文不卡| 公乱妇hd在线播放bd| 亚洲一二三在线| 综合在线一区| 97精品久久人人爽人人爽| 欧美精选一区二区三区| 欧美日韩亚洲三区| 日韩av在线免费电影| 4399午夜理伦免费播放大全| 99久久国产综合精品麻豆| 国产精品日本一区二区不卡视频 | 国产一级一区二区| 国产精品久久亚洲7777| 国产日韩欧美视频| 国产精品99在线播放| 日韩欧美一区二区久久婷婷| 91精品一区二区在线观看| 国产精品高潮呻吟88av| 日韩精品一区二区三区免费观看| 一区二区久久精品| 欧美日韩国产区| 久久不卡一区| 亚洲精品国产一区| 国产欧美一区二区精品性色超碰| 亚洲乱玛2021| 午夜毛片影院| 午夜天堂电影| 亚洲国产精品美女| 久久国产精品免费视频| 2023国产精品自产拍在线观看| 国产九九九精品视频| 亚洲四区在线观看| 大bbw大bbw巨大bbb| 久久久99精品国产一区二区三区| 国产精品久久久久免费a∨大胸| 国产精品69久久久| 久久人人爽爽| 欧美人妖一区二区三区| 亚洲福利视频一区| 国产精品二十区| 欧美一区二区三区不卡视频 | 蜜臀久久99静品久久久久久 | 国产精品v欧美精品v日韩精品v| 91久久精品国产91久久性色tv| 午夜精品一区二区三区在线播放| 海量av在线| 久久国产精品99国产精| 亚洲高清乱码午夜电影网| 国产二区三区视频| 午夜影院色| 国产精品一区二区免费视频| 国产国产精品久久久久| 国产69精品久久久久按摩| 国产日韩一二三区| 国产区二区| 97人人澡人人爽91综合色| 国产一区在线免费观看| 日韩精品一区二区三区四区在线观看| 午夜影院试看五分钟| 小萝莉av| 国产麻豆91欧美一区二区| 国产九九九精品视频| 91亚洲欧美强伦三区麻豆| 综合国产一区| 在线电影一区二区| 欧美一区二区三区艳史| 午夜影院5分钟| 欧美乱妇高清无乱码| 欧美一区二区久久久| 国产欧美一区二区三区免费| 欧洲激情一区二区| 欧美一区二区三区久久精品| 国产精品免费一视频区二区三区| 久久99精| 国精偷拍一区二区三区| 国产偷窥片| 午夜精品一区二区三区在线播放| 国产亚洲精品久久777777| 久久精品国语| 夜色av网| 综合国产一区| 国产欧美一区二区精品久久久| 999亚洲国产精| 久久精品国产一区二区三区| 久久免费视频99| 满春阁精品av在线导航| 99国产精品久久久久老师| 久久夜色精品国产亚洲| 中文字幕日本一区二区| 超碰97国产精品人人cao| 国产一区亚洲一区| 中文av一区| 午夜性电影| 久久精品一| 欧美一区二区三区免费看| 欧美日韩三区二区| 国产黄色一区二区三区| 欧洲国产一区| 国产精品九九九九九九九| 乱子伦农村| 国产理论片午午午伦夜理片2021 | 午夜免费网址| 国产精品国产三级国产播12软件| 精品久久二区| 欧美乱妇在线视频播放| 国产大学生呻吟对白精彩在线| 欧美精品六区| 亚洲精品乱码久久久久久麻豆不卡| 欧美日韩一二三四区| 亚洲高清毛片一区二区| 99日本精品| 精品视频久| 久久久久久中文字幕| 91久久精品久久国产性色也91| 一区二区欧美精品| 国产精品96久久久久久久| 国产欧美一区二区三区视频| 精品国产一区二区三区高潮视| 91看黄网站| 国产精品国产一区二区三区四区| 91中文字幕一区| 精品一区二区在线视频| 午夜肉伦伦| 国产欧美一区二区三区不卡高清 | 欧美精选一区二区三区| 中文字幕一区二区在线播放| 中文字幕一区二区三区免费| 玖玖精品国产| 国模精品免费看久久久| 一区二区久久精品|